VacayAway Work Breakdown Structure and Project Plan/NetworkWrite a six to eight (6-8) page paper in which you will:1.Discuss the value of a project charter and, based on your research, include an outline of the components which you deem necessary for your project. Note: You do not need to write a charter.2.Specify the stakeholders for the project, and analyze the position of each for the project, in terms of their influence, as well as their attitude toward the project (i.e., positive, neutral, or negative).3.Create a WBS for your project using the proper format (MS Word, MS Excel, Visio, or any other applicable format) to depict WBS graphically (see the example on page 110 of the textbook). Alternatively, you may use a coded format using MS Word (see example on page 115. The example is in MS Project format but the same could be done in MS Word).4.Create a project plan / network using the proper format (MS Word, MS Excel, or any other applicable format) to depict the project network (example on page 173). Be sure that all typical components on a project network are included, and critical path is properly depicted.5.Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.6.Format your assignment according to the following formatting requirements:a.Typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.b.Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page is not included in the required page length.c.Include a reference page. Citations and references must follow APA format. The reference page is not included in the required page length.The specific course learning outcomes associated with this assignment are:•Develop a project plan including the critical elements of project scope, priorities, Work Breakdown Structure (WBS), and communication plan.•Formulate a WBS using principles of project scheduling and budgeting, and develop cost and time estimates and allocate resources.•Use technology and information resources to research issues in project management.•Write clearly and concisely about project management using proper writing mechanics.
VacayAway Work Breakdown Structure and Project Plan/Network
07
Aug